HR & Operations

Data moved between systems,
checked before it lands, not after

A system migration usually turns up messy data only after it has already landed in the new tool, the most expensive place to find a mismatch. We build an agent that maps fields between the old and new systems and validates records before and after the move. You get a full mismatch report instead of a surprise three weeks later.

from$800
Timeline1 to 3 weeks
What is includedField mapping between source and destination systemsPre-migration validation against the old system's rulesBatch migration with rollback on failurePost-migration reconciliation, record by recordMismatch and duplicate report before go-live
full reconciliationof every migrated record, not a sample
dry run firston every migration before the real move
zero silent failuresevery mismatch is reported, not dropped

Where the mismatch actually hides

A system migration almost never fails at the plan stage. It fails three weeks after go-live. Someone notices a customer record with two different phone numbers in two different places. Or a report that no longer adds up, because a field was mapped to the wrong column. The mismatch was there the whole time. It just was not visible until the new system had already become the one people rely on. By then it is the most expensive point to discover it, since the old system is often half decommissioned.

The core difficulty is that the old and new systems rarely model data the same way. A field that was free text in one system might be a strict category in the other. A relationship that was implicit in one schema has to be made explicit in the other. Whoever is doing the migration has to make hundreds of small mapping decisions. Any one of them can silently drop or distort data if it is wrong. Spreadsheets and export scripts can move the data. They rarely check whether what landed on the other side still means the same thing.

The second failure mode is duplicates and partial records that accumulate over the old system’s life, things nobody cleaned up because they never caused a visible problem. A migration is often the first time anyone actually looks closely at years of accumulated data. Duplicate customers, orphaned records, inconsistent formatting: whatever it finds becomes the migration’s problem to solve, even though it was not created by the migration.

What the agent checks before and after the move

The agent builds and applies a field mapping between the source and destination systems, whatever those are: a CRM, an ERP, a spreadsheet or a custom legacy system. It validates records against the old system’s own rules before anything moves, catching a mismatch while it is still cheap to fix. The migration itself runs in batches with rollback on failure, so a bad batch does not leave the destination system half-migrated.

After the move, the agent reconciles every migrated record against the source, one by one, not a sample. It produces a mismatch and duplicate report instead of assuming silence means success. Before any of this touches real data, it runs a full dry run on a representative sample. The mapping and validation logic gets tested against your actual data’s quirks before the real migration happens. Every record moved and every exception raised gets written to a full log.

Where the call still sits with your team

Deciding how to resolve a specific mismatch stays with a person who knows the data’s history. Same for whether a duplicate record should be merged, deleted or kept as two separate entities, and whether an unusual legacy record is even worth migrating. The agent reports every mismatch. It does not guess at a resolution or silently pick one side. Signing off that a migration is complete, and the old system can be retired, is also a human decision, made after reviewing the reconciliation report.

Why “zero silent failures” is an actual property, not a slogan

Reconciliation runs against every migrated record, not a sample. That is what makes “zero silent failures” real: every mismatch gets reported, nothing gets quietly dropped or guessed at. A dry run on a sample always happens first, before the real migration touches live data. Batches roll back on failure instead of leaving a partially migrated system behind. Data moves only through the access granted to both systems, and we do not keep a separate copy once the migration is verified and closed.

Price and timeline

Option Price What it covers Timeline
Single automation from $800 One source and one destination system, full reconciliation and a mismatch report 1 to 3 weeks
Department package from $2,500 Data migration plus document OCR extraction and ongoing SaaS backup monitoring for the new system 2 to 4 weeks

Running cost is usually $20 to $70 a month in model usage for the migration itself. It tapers off once the move is reconciled and closed, with a budget cap set before launch.

If the source system holds scanned documents rather than clean records, document OCR and extraction turns those into structured data before this agent maps and moves it. Once data lands safely in the new system, SaaS backup and monitoring automation makes sure a lockout or sync failure does not repeat the same loss. Internal knowledge base Q&A helps a team find things in the new system once the structure has changed. For a real-world case where a full system had to be rebuilt from an export, see the factory ERP recovery case study. For infrastructure stood up cleanly from scratch, see the private network service case study. More on the broader approach is on the AI agents service page and the automation-everything overview.

Planning a migration you would rather not find mismatches in three weeks from now? Get in touch and we will look at your source system first.

Tired of doing this by hand? We can take the whole routine off your team, not only this step: Routine takeover, from $400 →

FAQ

How much does a data migration automation cost?

from $800 for one source and one destination system. Complex legacy schemas add time, quoted after a short review of your data.

How long does a migration take?

1 to 3 weeks depending on data volume and how clean the source system is, always including a dry run before the real move.

What systems can it migrate between?

Any system with an API, export file or database access. CRMs, ERPs, spreadsheets, and custom or legacy systems like the self-hosted ERP we rebuilt for a factory.

What happens if data does not match after the move?

Every mismatch gets reported, never silently dropped or guessed at. A migration with unresolved mismatches does not go live until a human decides how to handle each one.

Is our data secure during migration?

Data moves through the access you grant to both systems. We do not keep a separate copy once the migration is verified and closed.

Start here

Tell us the problem.
We bring the system.

A 30-minute call, then a written plan with numbers within 48 hours. No obligation. If we are not the right fit, we will say so and point you to someone who is.

LIKE WHAT YOU SEE?

This site is our work.
Want one like it?

Ten languages, no page builder, launched in 2026 by a team working since 2015. We can build the same quality into your site.

  • 10 languages
  • Since 2015
Get a site like this →